Go Back   N-Scale > Show Your Layout > Layout Central
Register FAQ Members List Members World Map Calendar Downloads Mark Forums Read vBExperience

Layout Central ....this is the place to show your layouts/pikes, your layout construction, and all the fine works in progress we have going on.....don't be shy, modelers are at all stages of progress!

» Site Navigation
Home page
Forum
Featured Layouts
Personal Albums
Model Train Photos
Real Train Photos
Movies
Christmas Photo Contest
Download
Big Chat
Classifieds
DCC
Hints & Tips
Shop
Featured Links
Web Links
F.A.Q.
User CP
» Awarded Member
Member:
goodstuff3

Monthly Contest Winner
Title: NSO Engineer
join date: October 22, 2009, 9:08 pm
posts: 5349
» Featured Layout
» Featured P.A.

photo by : Slamdunk
**********
Rating
9.83

views: 81
» Top Photo Rating

category: Mow
photo by :

10.00
**********
» Last Classifieds Ad

by james-trainmaster

» Most Downloaded and Viewed Links
2802
N Scale Supply
2474
Custom N Scale Coffee Table Layouts
1494
jpg Track 1
1233
Fifer Hobby Supply LLC
1214
4 N scale
1073
zip Trainz
793
zip Screensaver Nscale
773
Ngineering
701
zip Railroad Tycoon 3
677
ashlintrains.com
Welcome to the N-Scale.
Welcome to Nscale.org Community!

You are currently viewing our boards as a guest which gives you limited access to our forum and pics features. By joining our free community, you will be able to participate in the discussions, search the forum, send private messages, vote in polls, upload your own pictures and movies to the galleries or your personal album, and access many other special features. Registration is fast, simple and absolutely free, so sign up today! If you have any problems with the registration process or your account login, please contact support.

Reply
 
Thread Tools Display Modes
Old 12-15-2013, 05:32 PM   #1
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
CSX Appalachian Line 1.0

This is my first layout. It will be prototype freelanced, modern era CSX. Just a Single mainline, a passing siding, and a few spurs. Bench work is modular for easy expandability and moving to a new location. It rolls on caster wheels for easy access to the hidden track, that's under a hollow hillside. The layout is 11.5' X 6.5' and uses Atlas code 65 track. Most of visible mainline uses 15.5" radius curves, sharper curves hidden under hillside. I will also add a river and 2 bridges. The backdrop will be attached to the wall at a later time. That's all for now, will post more as progress continues. Comments welcome.

Last edited by Team DTO : 10-07-2018 at 09:48 AM.
Team DTO is offline   Reply With Quote
Old 12-15-2013, 06:14 PM   #2
Tony35
NSO Special Line Conductor
Senior Member
Points: 42,606, Level: 50
Points: 42,606, Level: 50 Points: 42,606, Level: 50 Points: 42,606, Level: 50
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Tony35's Avatar
 
Activity Longevity
0/20 13/20
Today Posts
0/0 ssss10302
Location: Slinger

United States

Posts: 10,302
Thanks: 611
Thanked 646 Times in 388 Posts
Rep Power: 34 Tony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO train
looks like you are off to a great start
__________________

Tony35 is offline   Reply With Quote
Old 12-15-2013, 06:39 PM   #3
Country Joe
First Line Managers
Moderator
Points: 75,803, Level: 67
Points: 75,803, Level: 67 Points: 75,803, Level: 67 Points: 75,803, Level: 67
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Country Joe's Avatar
 
Activity Longevity
1/20 17/20
Today Posts
0/0 ssss19646
Location: Vero Beach, FL

United States

Posts: 19,646
Thanks: 1,850
Thanked 1,529 Times in 953 Posts
Rep Power: 61 Country Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond reputeCountry Joe has a reputation beyond repute
Awards Showcase
NSO AWARDS 2008 Nominees Railroad Yardmaster 
Total Awards: 2
Looks like a good plan for a first layout Lou. My only suggestion is to put in another passing siding or two. Right now you can only run 1 train at a time.
__________________
TTFN
Country Joe
President, Chief Cook and Bottle Washer of the New York Central, Alma & Jupiter Bay Subdivision, cleverly disguised as a mild mannered country boy.

Photobucket page: http://s387.photobucket.com/albums/o...oeb/?start=all

You Tube channel:
http://www.youtube.com/user/challenger3977


Country Joe is offline   Reply With Quote
Old 12-15-2013, 07:19 PM   #4
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
Quote:
Originally Posted by Country Joe View Post
Looks like a good plan for a first layout Lou. My only suggestion is to put in another passing siding or two. Right now you can only run 1 train at a time.
This layout is DC for now, no blocks. But when I change over to DCC I will probably add a passing siding/staging track in the rear.
Attached Images
File Type: jpg CSX Appalachian line.jpg (77.1 KB, 220 views)
Team DTO is offline   Reply With Quote
Old 12-15-2013, 08:00 PM   #5
rich311k
NSO Engineer
Senior Member
Points: 25,918, Level: 39
Points: 25,918, Level: 39 Points: 25,918, Level: 39 Points: 25,918, Level: 39
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
rich311k's Avatar
 
Activity Longevity
0/20 11/20
Today Posts
0/0 sssss7442
Location: Bel Air

United States

Posts: 7,442
Thanks: 961
Thanked 501 Times in 323 Posts
Rep Power: 31 rich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO train
Looks like a good start to me. Nice work so far.
rich311k is offline   Reply With Quote
Old 12-15-2013, 08:04 PM   #6
Tony35
NSO Special Line Conductor
Senior Member
Points: 42,606, Level: 50
Points: 42,606, Level: 50 Points: 42,606, Level: 50 Points: 42,606, Level: 50
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Tony35's Avatar
 
Activity Longevity
0/20 13/20
Today Posts
0/0 ssss10302
Location: Slinger

United States

Posts: 10,302
Thanks: 611
Thanked 646 Times in 388 Posts
Rep Power: 34 Tony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO trainTony35 is controlling the second NSO train
plan and wire for DCC now will save a ton of work later
JM of course
__________________

Tony35 is offline   Reply With Quote
Old 12-15-2013, 11:35 PM   #7
Rosconz
Conductor
Moderator
Points: 106,700, Level: 79
Points: 106,700, Level: 79 Points: 106,700, Level: 79 Points: 106,700, Level: 79
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Rosconz's Avatar
 
Activity Longevity
0/20 17/20
Today Posts
0/0 sssss9318
Location: Napier, New Zealand.

New Zealand

Posts: 9,318
Thanks: 681
Thanked 1,046 Times in 576 Posts
Rep Power: 52 Rosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond reputeRosconz has a reputation beyond repute
Awards Showcase
Monthly  Contest Winner Most Helpful Member 2008 Railroad Conductor Railroad Yardmaster 
Total Awards: 4
Looking like a fun first layout Lou. You mention a tunnel, any chance you can sketch on the plan where that will be?
__________________
Isn't it wonderful to be here.


The Nevawaz and Nevawilby Railroad
Rosconz is offline   Reply With Quote
Old 12-16-2013, 12:23 PM   #8
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
Quote:
Originally Posted by Rosconz View Post
Looking like a fun first layout Lou. You mention a tunnel, any chance you can sketch on the plan where that will be?
Here are some pics. By placing the tunnels at the beginning of curves, or completely covering the curves, it helps eliminate the roundy round effect.

Last edited by Team DTO : 04-11-2018 at 01:47 PM.
Team DTO is offline   Reply With Quote
Old 12-16-2013, 04:20 AM   #9
ike8120
NSO Special Line Conductor
Senior Member
Points: 101,837, Level: 77
Points: 101,837, Level: 77 Points: 101,837, Level: 77 Points: 101,837, Level: 77
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
ike8120's Avatar
 
Activity Longevity
0/20 15/20
Today Posts
0/0 ssss21187
Location: Tinton Falls

United States

Posts: 21,187
Thanks: 910
Thanked 1,470 Times in 925 Posts
Rep Power: 71 ike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond repute
Awards Showcase
Railroad Conductor Best Member Participation 2012 Railroad Yardmaster 
Total Awards: 3
Nice simple layout.
__________________
It's not whats best... it whats best for you"
Gary
ike8120 is offline   Reply With Quote
Old 12-16-2013, 11:41 AM   #10
Karl R
Professional Engineer
Senior Member
Points: 15,598, Level: 30
Points: 15,598, Level: 30 Points: 15,598, Level: 30 Points: 15,598, Level: 30
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Karl R's Avatar
 
Activity Longevity
0/20 10/20
Today Posts
0/0 sssss2917
Location: Key West

United States

Posts: 2,917
Thanks: 430
Thanked 496 Times in 274 Posts
Rep Power: 23 Karl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO train
It looks like a fine plan, with a lot of room for modifications or additions as you go along. You have a quality looking bench work and base to work on as well. A good way to start!


Always be aware of reach-across, switch placement, hidden trackage and such, because invariably they will become the sore points when we go on to operate the line. (no need to wonder how i know this)
__________________
Karl Reutling, Superintendent
the Bone Island Extension Railway

-The Conch Republic

Last edited by Karl R : 12-16-2013 at 11:46 AM.
Karl R is offline   Reply With Quote
Old 12-16-2013, 12:28 PM   #11
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
Quote:
Originally Posted by Karl R View Post
It looks like a fine plan, with a lot of room for modifications or additions as you go along. You have a quality looking bench work and base to work on as well. A good way to start!


Always be aware of reach-across, switch placement, hidden trackage and such, because invariably they will become the sore points when we go on to operate the line. (no need to wonder how i know this)
The rear of the layout/hillside will be left hollow, so with the bench work on caster wheels, just slide it away from the wall.
Attached Images
File Type: jpg DSCN0080.JPG (156.2 KB, 91 views)
File Type: jpg DSCN0078.JPG (123.5 KB, 67 views)
Team DTO is offline   Reply With Quote
Old 12-16-2013, 01:00 PM   #12
nscaler44
NSO Special Conductor
Senior Member
Points: 41,822, Level: 49
Points: 41,822, Level: 49 Points: 41,822, Level: 49 Points: 41,822, Level: 49
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
nscaler44's Avatar
 
Activity Longevity
0/20 12/20
Today Posts
0/0 sssss9991
Location: Santee

United States

Posts: 9,991
Thanks: 560
Thanked 957 Times in 498 Posts
Rep Power: 39 nscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond reputenscaler44 has a reputation beyond repute
Awards Showcase
Monthly  Contest Winner Monthly  Contest  Second Place 
Total Awards: 2
Good start. Nothing wrong with this plan. I would suggest changing now to DCC, but I understand the financials as well. With DCC you only need a red and black wire for this layout. Best of luck. Jim CM&T
nscaler44 is offline   Reply With Quote
Old 12-16-2013, 06:53 PM   #13
eurocanuck
First Line Managers
Senior Member
Points: 11,982, Level: 26
Points: 11,982, Level: 26 Points: 11,982, Level: 26 Points: 11,982, Level: 26
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
eurocanuck's Avatar
 
Activity Longevity
0/20 15/20
Today Posts
0/0 ssssss738
Location: Best Place on earth

Canada

Posts: 738
Thanks: 50
Thanked 97 Times in 29 Posts
Rep Power: 15 eurocanuck has found the double trackseurocanuck has found the double trackseurocanuck has found the double tracks
Nice start on this layout. How are liking the True Track?
eurocanuck is offline   Reply With Quote
Old 12-17-2013, 11:24 AM   #14
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
Quote:
Originally Posted by nscaler44 View Post
Good start. Nothing wrong with this plan. I would suggest changing now to DCC, but I understand the financials as well. With DCC you only need a red and black wire for this layout. Best of luck. Jim CM&T
DCC ready.
Attached Images
File Type: jpg DSCN0088.JPG (208.6 KB, 101 views)
Team DTO is offline   Reply With Quote
Old 12-17-2013, 05:00 AM   #15
Turbo_Boost
Entry level Engineer
Senior Member
Points: 4,879, Level: 16
Points: 4,879, Level: 16 Points: 4,879, Level: 16 Points: 4,879, Level: 16
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Activity Longevity
0/20 10/20
Today Posts
0/0 ssssss371
Location: Tuscon

United States

Posts: 371
Thanks: 15
Thanked 35 Times in 18 Posts
Rep Power: 10 Turbo_Boost has found the double tracksTurbo_Boost has found the double tracksTurbo_Boost has found the double tracks
Is it too late to add a double main line???!!!

Looks great, will be watching this plan take effect, so hurray up and keep updating!!
__________________
Turbo_Boost is offline   Reply With Quote
Old 12-17-2013, 11:42 AM   #16
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
Quote:
Originally Posted by Turbo_Boost View Post
Is it too late to add a double main line???!!!

Looks great, will be watching this plan take effect, so hurray up and keep updating!!
My initial plan was to have a double mainline, but since I am using sectional track, I was concerned about future electrical conductivity problems. The layout is being built on 2.5 modules, bolted together (see pic). I plan to re-use all material in a larger future layout. So CSXAL v.2.0 just might be a double mainline, but with feeders soldered to each piece of flex track.
Attached Images
File Type: jpg DSCN0100.JPG (179.3 KB, 62 views)

Last edited by Team DTO : 08-28-2014 at 07:12 PM.
Team DTO is offline   Reply With Quote
Old 12-17-2013, 11:33 AM   #17
rich311k
NSO Engineer
Senior Member
Points: 25,918, Level: 39
Points: 25,918, Level: 39 Points: 25,918, Level: 39 Points: 25,918, Level: 39
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
rich311k's Avatar
 
Activity Longevity
0/20 11/20
Today Posts
0/0 sssss7442
Location: Bel Air

United States

Posts: 7,442
Thanks: 961
Thanked 501 Times in 323 Posts
Rep Power: 31 rich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO trainrich311k is controlling the third NSO train
You are doing some nice work. Going to be a nice first layout.
rich311k is offline   Reply With Quote
Old 02-17-2014, 05:44 PM   #18
Team DTO
Junior Engineer
Junior Member
Points: 6,225, Level: 18
Points: 6,225, Level: 18 Points: 6,225, Level: 18 Points: 6,225, Level: 18
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Team DTO's Avatar
 
Activity Longevity
0/20 9/20
Today Posts
0/0 ssssss179
Location: Whitestone, NY

United States

Posts: 179
Thanks: 55
Thanked 25 Times in 15 Posts
Rep Power: 8 Team DTO has found the right track
Here's an update to the CSXAL. I cut and installed some fascia/profile board and stacked some foam, keeping the rear of the hillside hollow for track maintenance. Note how the top of the tunnel liner comes off for easy track cleaning.
Attached Images
File Type: jpg DSCN0121.JPG (163.6 KB, 54 views)
File Type: jpg DSCN0122.JPG (194.8 KB, 55 views)
File Type: jpg DSCN0126.JPG (142.7 KB, 52 views)

Last edited by Team DTO : 10-07-2018 at 09:49 AM.
Team DTO is offline   Reply With Quote
Old 02-17-2014, 05:50 PM   #19
ike8120
NSO Special Line Conductor
Senior Member
Points: 101,837, Level: 77
Points: 101,837, Level: 77 Points: 101,837, Level: 77 Points: 101,837, Level: 77
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
ike8120's Avatar
 
Activity Longevity
0/20 15/20
Today Posts
0/0 ssss21187
Location: Tinton Falls

United States

Posts: 21,187
Thanks: 910
Thanked 1,470 Times in 925 Posts
Rep Power: 71 ike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond reputeike8120 has a reputation beyond repute
Awards Showcase
Railroad Conductor Best Member Participation 2012 Railroad Yardmaster 
Total Awards: 3
Before you know you will be running some trains.
__________________
It's not whats best... it whats best for you"
Gary
ike8120 is offline   Reply With Quote
Old 02-17-2014, 07:08 PM   #20
Karl R
Professional Engineer
Senior Member
Points: 15,598, Level: 30
Points: 15,598, Level: 30 Points: 15,598, Level: 30 Points: 15,598, Level: 30
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
Karl R's Avatar
 
Activity Longevity
0/20 10/20
Today Posts
0/0 sssss2917
Location: Key West

United States

Posts: 2,917
Thanks: 430
Thanked 496 Times in 274 Posts
Rep Power: 23 Karl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO trainKarl R is controlling the second NSO train
Good for you that you are planning ahead for access. Looks great.
__________________
Karl Reutling, Superintendent
the Bone Island Extension Railway

-The Conch Republic
Karl R is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
SP Modoc Line Columbia Branch COandW Layout Central 8 07-04-2010 11:03 AM
Our Local Short Line COandW Prototype Railroads 18 01-31-2010 05:21 PM
Railway Slogans Puddington All Topics allowed here 9 08-20-2009 01:20 PM
Does the Gotthard line have a future? ado.c Prototype Railroads 9 01-30-2009 11:52 AM
CSX Corporation declares quarterly dividends, adop sandjam All Topics allowed here 1 10-24-2004 09:33 PM


All times are GMT -6. The time now is 09:24 PM.


nscale.org