» Site Navigation
Home page
Forum
Featured Layouts
Personal Albums
Model Train Photos
Real Train Photos
Movies
Christmas Photo Contest
Download
Big Chat
Classifieds
DCC
Hints & Tips
Shop
Featured Links
Web Links
F.A.Q.
User CP
» Awarded Member
Member:
goodstuff3

Monthly Contest Winner
Title: NSO Engineer
join date: October 22, 2009, 9:08 pm
posts: 5346
» Featured Layout
» Featured P.A.

photo by : Slamdunk
**********
Rating
9.83

views: 81
» Top Photo Rating

category: Locomotives, Engines
photo by : Hirailtruck

10.00
**********
» Last Classifieds Ad

by james-trainmaster

» Most Downloaded and Viewed Links
2802
N Scale Supply
2474
Custom N Scale Coffee Table Layouts
1494
jpg Track 1
1233
Fifer Hobby Supply LLC
1214
4 N scale
1073
zip Trainz
793
zip Screensaver Nscale
773
Ngineering
701
zip Railroad Tycoon 3
677
ashlintrains.com
View Single Post
Old 01-11-2011, 08:43 PM   #18
noah_count
First Line Managers
Senior Member
Points: 45,777, Level: 52
Points: 45,777, Level: 52 Points: 45,777, Level: 52 Points: 45,777, Level: 52
Activity: 0%
Activity: 0% Activity: 0% Activity: 0%
 
noah_count's Avatar
 
Activity Longevity
0/20 15/20
Today Posts
0/0 sssss2429
Location: Eatonton, Georgia

United States

Posts: 2,429
Thanks: 68
Thanked 263 Times in 135 Posts
Rep Power: 24 noah_count is controlling the first NSO trainnoah_count is controlling the first NSO trainnoah_count is controlling the first NSO trainnoah_count is controlling the first NSO trainnoah_count is controlling the first NSO trainnoah_count is controlling the first NSO trainnoah_count is controlling the first NSO trainnoah_count is controlling the first NSO train
Well I guess it's time to call in the track crew. Here's a pic of the layout as it stands thus far. I've got to head back to work tomorrow after a couple of snow days but I managed to get this much done. Still need to do a light sanding of the cork roadbed to knock off any irregularities and high spots but then I can start laying track.
I haven't completely finished cutting near my turnouts, I always like to leave a little excess till I get the turnout in place. I also have yet to lay any roadbed on the other side of the gorge or install upper level track support there. I will wait to I get a better handle on my bridge and trestle placement before I do that but basically this phase of construction is about wrapped up.
More to come...
Attached Images
File Type: jpg Photo0593.jpg (180.9 KB, 192 views)
__________________
May the work of the incomparable John Allen
"The Wizard of Monterey" continue to live on in our hearts and minds and inspire us all!
Michael
Check out the "San Miguel RR" here
noah_count is offline   Reply With Quote
 

All times are GMT -6. The time now is 10:00 PM.


nscale.org